Project Name | Shougang international qinhuangdao logistics base | Project Introduction | Full screen 22 transparent screen, need full screen display screen, shooting effect is good. |
---|---|---|---|
Project Date | 1970.01 | Equipment used | Kommander F2,K1 |
Project Location | Qinhuangdao | Project Requirements | The screen connection is perfect. Good display effect, bright color, high refresh rate, no scan line. F2+K1 with load, achieve point-to-point display, make the picture more smooth and clear. |
View all cases
-
Stair screen of Pingdu Zhongjie square overpass
Project Name:Stair screen of Pingdu Zhongjie square overpass
Project Date:2021.06
Project Location:Pingdu City, Shandong Province
Project Introduction:Whole stair screen
-
Urumqi shenma bar
Project Name:Urumqi shenma bar
Project Date:2020.01
Project Location:Urumqi
Project Introduction:The large screen has a resolution of 1280x1280, which is a special-shaped screen of peach heart and rotated by 45
-
Sichuan Yanting Live House
Project Name:Sichuan Yanting Live House
Project Date:2022.05
Project Location:Yanting City, Sichuan Province
Project Introduction:1. One main screen on the front, 1DJ platform 2. Skyscreen square layout 3. Square screen around.
-
Bijie bar
Project Name:Bijie bar
Project Date:1970.01
Project Location:Guizhou
Project Introduction:P4 multiple LED screen
-
Shenling ring, Foshan, Guangdong
Project Name:Shenling ring, Foshan, Guangdong
Project Date:2022.04
Project Location:Foshan, Guangdong
Project Introduction:1. Three trapezoidal modules; 2. Load with sv8p + g616c; 3. One box and one card
-
A bar in Zunyi
Project Name:A bar in Zunyi
Project Date:2020.07
Project Location:Zunyi
Project Introduction:Control all LED screens with effects on the Resolume software
-
Beijing banana ring KTV
Project Name:Beijing banana ring KTV
Project Date:2021.02
Project Location:Beijing
Project Introduction:This project includes transparent screen module, soft module, outdoor P3 module, 1.86 module, 2.5 module and other multi specification modules. Each compartment adopts the combination of main screen 1.86 module and auxiliary screen 2.5 module. Each compar
-
Shenyang wedding hotel
Project Name:Shenyang wedding hotel
Project Date:2020.01
Project Location:Shenyang
Project Introduction:Nine door screens and one canopy
-
Riverside Hotel
Project Name:Riverside Hotel
Project Date:2020.12
Project Location:Ji'an City, Jiangxi Province
Project Introduction:1. One main screen and four auxiliary screens on the stage, and one ceiling screen on the top of the hall; 2. Indoor P3, main screen 3840x1728, four side screens 896x1728 and sky curtain 4736x2816.